Existing design included a concrete attenuation tank, no SuDS treatment and an adoptable foul & surface water pumping station, as well as a restricted discharge into a highway drain.
Value engineering opportunities should not be overlooked regardless of the project stage. By delivering this scheme via a gravity solution it removes risk to the developer, a better aesthetic that requires no compound and the maintenance to the statutory authority is improved.